Albany
Powering NZ’s largest crane – Kroll 1650L
Product Output
300kVA
Location
Albany
Year
2023
Client
Smiths Cranes / Naylor Love
CP-300 UPS chosen to power NZ’s largest tower crane on a critical Naylor Love project, saving 15 tonnes of CO2 each month
- Cranepower UPS: CP-300
- Tower Crane: Kroll 1650L – 320kVA
- Input Feed: 32A 400V 3-phase
- Annual CO2 Reduction: 180 tonnes
- Project Start: 2023
- Customer: Smiths Cranes / Naylor Love
- Building: Commercial building
Transformer delays on this Naylor Love project left them scrambling to find a power solution for the large Kroll 1650L tower crane (the largest in NZ). Smith Cranes presented Naylor Love with two options: a 450kVA generator running 60 hours a week and burning over 1000L of diesel each week, or a CP-300 that simply plugs into their existing general site power.
Naylor Love immediately chose the CP-300 option as it was cheaper, quieter and better for the environment than the diesel generator option.
The CP-300 gave Naylor Love a low emission way to stay on schedule.